Line 5 (Hangzhou Metro)

From Wikipedia, the free encyclopedia
Jump to navigation Jump to search
Line 5
 5 
201906245号线列车离开大运河站.jpg
Train of Line 5 departing The Grand Canal Station
MTR Hangzhou Logo.jpg
Overview
TypeRapid transit
SystemHangzhou Metro
StatusOperational
LocaleHangzhou, Zhejiang, China
TerminiLiangmu Road
Shanxian
Stations12 (in operation)
Services1
Operation
Opened24 June 2019; 7 months ago (2019-06-24)[1]
OwnerCity of Hangzhou
Operator(s)MTR Corporation (Hangzhou)[2]
CharacterUnderground
Rolling stock6 cars, Type AH
Technical
Line length17.76 km (11.04 mi)[1] (in operation)
ElectrificationOverhead line, 1,500 V DC
Operating speed80km/h (50mph)

Line 5 of the Hangzhou Metro (simplified Chinese: 杭州地铁五号线; traditional Chinese: 杭州地鐵五號線; pinyin: Hángzhōu Dìtiě Wǔhào Xiàn) is a subway line in Hangzhou. The line is colored cyan on system maps.

The section between Liangmu Road and Shanxian opened on June 24, 2019.[1]

Opening timeline[edit]

Segment Commencement Length Station(s) Name
Liangmu Road — Shanxian 24 June 2019[1] 17.76 km (11.04 mi)[1] 12

Stations[edit]

Hangzhou Metro Line 5.svg
Station name Connections
English Chinese
Laoyuhang 老余杭
Jinxing 金星
Lvting Road 绿汀路  3   16 
Gexiang 葛巷
Chuangjing Road 创景路  Airport Express 
Liangmu Road 良睦路
Hangzhou Normal University Cangqian Campus 杭师大仓前
Yongfu 永福
Wuchang 五常
Jiangcun 蒋村
Zhejiang University Zijingang Campus 浙大紫金港
Sanba 三坝  2 
Pingshui Street 萍水街
Hemu 和睦  10 
The Grand Canal 大运河
East Gongchen Bridge 拱宸桥东
Shanxian 善贤  3 
Xiwen Street 西文街
Xiangjisi Road 香积寺路  8 
Hangyang 杭氧
Datieguan 打铁关  1 
Baoshan Bridge 宝善桥
North Jianguo Road 建国北路  2 
Wan'an Bridge 万安桥  9 
Chengzhan 城站  1   7 
China Railway Hangzhou
Jiangcheng Road 江城路  7 
Houchaomen 候潮门
Nanxingqiao 南星桥  4 
Changhe 长河  6 
Jucai Road 聚才路
Jianghui Road 江晖路
Binkang Road 滨康路  1 
Bo'ao Road 博奥路
Jinji Road 金鸡路
People's Square 人民广场  2 
North Yucai Road 育才北路
Middle Tonghui Road 通惠中路
South Railway Station 火车南站 China Railway Hangzhounan
Shuangqiao 双桥
Guniangqiao 姑娘桥  Hangshao 

Description[edit]

Phase 1

Phase 1 of the line will be 48.6 km (30.2 mi) long with 36 stations and will run between Central Park station in Yuhang District and Xiangzhang Road station in Xiaoshan District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system including Hangshao line (through operation to Line 1 (Shaoxing Metro) of the neighboring Shaoxing Metro).[3]

Phase 2

Phase 2 of the line further extends 3.2 km and two stations east to Lvting Road. Phase 1 and 2 is expected to be operational by 2019.[4]

Western extension

A 5 km (3.1 mi), two station extension west to Laoyuhang station in Yuhang District started construction in 2018.[5]

Rolling stock[edit]

The line will use higher capacity six car Type AH trains which are 20cm wider than the Type B trains used in current Hangzhou Metro lines, increasing capacity by about 10%.[6]

References[edit]

  1. ^ a b c d e http://hangzhou.zjol.com.cn/jrsd/bwzg/201906/t20190624_10400959.shtml
  2. ^ "MTR : Concession Agreement for Hangzhou Metro Line 5 Signed". marketscreener.com. Retrieved 27 February 2019.
  3. ^ "杭州地铁5号线开工 余杭未来科技城3个车站率先建 - 杭网原创 - 杭州网". ori.hangzhou.com.cn. Retrieved 2019-02-06.
  4. ^ "运营中的杭州地铁1号线底下 5号线悄悄穿过 - 杭州网 - 杭州新闻中心". hznews.hangzhou.com.cn. Retrieved 2019-02-06.
  5. ^ "地铁5号线确定向西延伸 期待明年完工". zj.zjol.com.cn. Retrieved 2019-02-06.
  6. ^ "杭州地铁5号线"小青"已抵达杭州 预计今年年底开通 - 杭网原创 - 杭州网". ori.hangzhou.com.cn. Retrieved 2019-02-06.